Projects
1. M/S. Dilip Buildcon Limited, Bhopal (SWASTIK Engineering, Indore, M.P):-
a. Electrical Utility Shifting of HT/LT Lines at Doddaballapur to Hoskote section of NH-648 (Old NH-207)
under NHAI. (Project Cost: 11.23Crores)
2. M/s. ARCONS Infrastructures & Constructions (P) Ltd, Chhindwara, M.P: -
b. Package 3: - Electrical Utility Shifting work of HT/LT Lines for Construction of Bangarpete to
Bethamangala Road Project (53+500kmtr to 71+000kmtr) under NHAI. (Project Cost: 5.5 Crores)
3. M/s. Dilip Buildcon Limited, Bhopal: - (Utility Shifting Works)
a. Package 1: - Electrical Utility Shifting work of HT/LT Lines for Construction of Bangalore to Malur
Road Project (0.700kmtr to 26+400kmtr) under NHAI. (Project Cost :7.3 Crores)
b. Package 2: - Electrical Utility Shifting work of HT/LT Lines for Construction of Malur to Bangarpete
Road Project (26+400kmtr to 53+500kmtr) under NHAI. (Project Cost : 4.7 Crores)
3. M/s. Dilip Buildcon Limited, Bhopal :- (Temporary HT Connections)
a. HT Temporary power supply to an extent of 960KVA for Construction of National Highway
(Bangalore Chennai Exp), Bellavi Village, Malur. (Project Cost : 81Lacs)
b. HT Temporary power supply to an extent of 960KVA for Construction of National Highway
(Bangalore Chennai Exp) Dedicated Feeders from MUSS to Base camp premises, Sulikunte Village,
Bangarpet . (Project Cost : 1.17Cr)
c. HT Temporary power supply to an extent of 90KVA for Construction of National Highway
(Bangalore Chennai Exp), Jadigenahalli Village, Hoskote. (Project Cost : 26Lacs)
d. HT Temporary power supply to an extent of 90KVA for Construction of National Highway
(Bangalore Chennai Exp), Kamblipura village, Nandagudi. (Project Cost : 20Lacs)
e. HT Temporary Installation to an extent of 700KVA for Road Construction Purpose, Birahalli
Village Nandagudi hobli Hoskote. (Project Cost : 23Lacs)
f. HT Temporary Installation to an extent of 400KVA for Road Construction Purpose at Mallepura
Village Devanahalli Taluk. (Project Cost : 18Lacs)
g. HT Temporary Installation to an extent of 400KVA for Road Construction Purpose at
Savakanahalli Village Devanahalli Taluk. (Project Cost : 9Lacs)
h. HT Temporary Installation to an extent of 700KVA for Road Construction Purpose at
Muddanayakanahalli Village (Industrial Area) Devanahalli Taluk. (Project Cost : 23Lacs)
i. HT Temporary Installation to an extent of 90KVA for Road Construction Purpose at Chainage
24+500, Doddasabbenahalli Village, Bangarpete. (Project Cost : 11.5Lacs)
j. HT Temporary Installation to an extent of 90KVA for Road Construction Purpose at Chainage
48+100, Kavaranahalli village, Bangarpete. (Project Cost : 9Lacs)
4. M/s. ARCONS Infrastructures & Constructions (P) Ltd, Chhindwara, M.P:-
(Temporary HT Connections)
a. HT Temporary Installation to an extent of 400KVA for Road Construction Purpose at Venkatapura
Village, Bethamangala. (Project Cost : 21Lacs)
5. M/s. Escalates Tech India Pvt. Ltd.
Infra Up gradation of Street light under BBMP. (Project Cost : 25Lacs)
6. Increasing the Vertical Clearance of Existing 220KV and 66KV line for
Proposed 6Lane road of Bangalore-Chennai Express section way corridor
under NHDP Ph-VI on self-execution basis of M/s. National Highway
Authority of India by KPTCL.
a. Package 1 & 2 of M/s. Dilip Buildcon Ltd (Project Cost : 11.2Cr)
b. Package 3 of M/s. ARCONS Infrastructures & Constructions (P) Ltd (Project Cost :
3.9Cr)
7. M/S. R K Infra Private Limited, Bangalore: -
A. Electrical Utility Shifting of HT/LT Lines at Nelmangala to Madhurai. (Project Cost: 15.46Crores)