Projects

1. M/S. Dilip Buildcon Limited, Bhopal (SWASTIK Engineering, Indore, M.P):-

a. Electrical Utility Shifting of HT/LT Lines at Doddaballapur to Hoskote section of NH-648 (Old NH-207)

under NHAI. (Project Cost: 11.23Crores)

2. M/s. ARCONS Infrastructures & Constructions (P) Ltd, Chhindwara, M.P: -

b. Package 3: - Electrical Utility Shifting work of HT/LT Lines for Construction of Bangarpete to

Bethamangala Road Project (53+500kmtr to 71+000kmtr) under NHAI. (Project Cost: 5.5 Crores)

3. M/s. Dilip Buildcon Limited, Bhopal: - (Utility Shifting Works)

a. Package 1: - Electrical Utility Shifting work of HT/LT Lines for Construction of Bangalore to Malur

Road Project (0.700kmtr to 26+400kmtr) under NHAI. (Project Cost :7.3 Crores)

b. Package 2: - Electrical Utility Shifting work of HT/LT Lines for Construction of Malur to Bangarpete

Road Project (26+400kmtr to 53+500kmtr) under NHAI. (Project Cost : 4.7 Crores)

3. M/s. Dilip Buildcon Limited, Bhopal :- (Temporary HT Connections)

a. HT Temporary power supply to an extent of 960KVA for Construction of National Highway

(Bangalore Chennai Exp), Bellavi Village, Malur. (Project Cost : 81Lacs)

b. HT Temporary power supply to an extent of 960KVA for Construction of National Highway

(Bangalore Chennai Exp) Dedicated Feeders from MUSS to Base camp premises, Sulikunte Village,

Bangarpet . (Project Cost : 1.17Cr)

c. HT Temporary power supply to an extent of 90KVA for Construction of National Highway

(Bangalore Chennai Exp), Jadigenahalli Village, Hoskote. (Project Cost : 26Lacs)

d. HT Temporary power supply to an extent of 90KVA for Construction of National Highway

(Bangalore Chennai Exp), Kamblipura village, Nandagudi. (Project Cost : 20Lacs)

e. HT Temporary Installation to an extent of 700KVA for Road Construction Purpose, Birahalli

Village Nandagudi hobli Hoskote. (Project Cost : 23Lacs)

f. HT Temporary Installation to an extent of 400KVA for Road Construction Purpose at Mallepura

Village Devanahalli Taluk. (Project Cost : 18Lacs)

g. HT Temporary Installation to an extent of 400KVA for Road Construction Purpose at

Savakanahalli Village Devanahalli Taluk. (Project Cost : 9Lacs)

h. HT Temporary Installation to an extent of 700KVA for Road Construction Purpose at

Muddanayakanahalli Village (Industrial Area) Devanahalli Taluk. (Project Cost : 23Lacs)

i. HT Temporary Installation to an extent of 90KVA for Road Construction Purpose at Chainage

24+500, Doddasabbenahalli Village, Bangarpete. (Project Cost : 11.5Lacs)

j. HT Temporary Installation to an extent of 90KVA for Road Construction Purpose at Chainage

48+100, Kavaranahalli village, Bangarpete. (Project Cost : 9Lacs)

4. M/s. ARCONS Infrastructures & Constructions (P) Ltd, Chhindwara, M.P:-

(Temporary HT Connections)

a. HT Temporary Installation to an extent of 400KVA for Road Construction Purpose at Venkatapura

Village, Bethamangala. (Project Cost : 21Lacs)

5. M/s. Escalates Tech India Pvt. Ltd.

Infra Up gradation of Street light under BBMP. (Project Cost : 25Lacs)

6. Increasing the Vertical Clearance of Existing 220KV and 66KV line for

Proposed 6Lane road of Bangalore-Chennai Express section way corridor

under NHDP Ph-VI on self-execution basis of M/s. National Highway

Authority of India by KPTCL.

a. Package 1 & 2 of M/s. Dilip Buildcon Ltd (Project Cost : 11.2Cr)

b. Package 3 of M/s. ARCONS Infrastructures & Constructions (P) Ltd (Project Cost :

3.9Cr)

7. M/S. R K Infra Private Limited, Bangalore: -

A. Electrical Utility Shifting of HT/LT Lines at Nelmangala to Madhurai. (Project Cost: 15.46Crores)